[1]
Jeong, J.-H. et al. 2001. A PROBABILISTIC APPROACH TO SAWCUT TIMING AND DEPTH REQUIREMENTS FOR NEWLY CONSTRUCTED PORTLAND CEMENT CONCRETE PAVEMENTS. Proceedings of the International Conference on Concrete Pavements. 7, 1 (Sep. 2001). DOI:https://doi.org/10.33593/iccp.v7i1.218.