(1)
Jeong, J.-H.; Chapke, N.; Zollinger, D. G. A PROBABILISTIC APPROACH TO SAWCUT TIMING AND DEPTH REQUIREMENTS FOR NEWLY CONSTRUCTED PORTLAND CEMENT CONCRETE PAVEMENTS. ICCP 2001, 7 (1). https://doi.org/10.33593/iccp.v7i1.218.