1.
Jeong JH, Chapke N, Zollinger DG. A PROBABILISTIC APPROACH TO SAWCUT TIMING AND DEPTH REQUIREMENTS FOR NEWLY CONSTRUCTED PORTLAND CEMENT CONCRETE PAVEMENTS. ICCP. 2001;7(1). doi:10.33593/iccp.v7i1.218