Jeong, J.-H., Chapke, N., & Zollinger, D. G. (2001). A PROBABILISTIC APPROACH TO SAWCUT TIMING AND DEPTH REQUIREMENTS FOR NEWLY CONSTRUCTED PORTLAND CEMENT CONCRETE PAVEMENTS. Proceedings of the International Conference on Concrete Pavements, 7(1). https://doi.org/10.33593/iccp.v7i1.218