Jeong, J.-H., Chapke, N. and Zollinger, D.G. (2001) “A PROBABILISTIC APPROACH TO SAWCUT TIMING AND DEPTH REQUIREMENTS FOR NEWLY CONSTRUCTED PORTLAND CEMENT CONCRETE PAVEMENTS”, Proceedings of the International Conference on Concrete Pavements, 7(1). doi:10.33593/iccp.v7i1.218.