[1]
J.-H. Jeong, N. Chapke, and D. G. Zollinger, “A PROBABILISTIC APPROACH TO SAWCUT TIMING AND DEPTH REQUIREMENTS FOR NEWLY CONSTRUCTED PORTLAND CEMENT CONCRETE PAVEMENTS”, ICCP, vol. 7, no. 1, Sep. 2001, doi: 10.33593/iccp.v7i1.218.