[1]
A. Seruga and R. Szydłowski, “Experiences Resulted from Construction of Two-way Post-Tensioned Concrete Pavement”, ICCP, vol. 10, no. 1, Jan. 2025, doi: 10.33593/iccp.v10i1.375.