NON-CONVENTIONAL VS. CONVENTIONAL CONCRETE PAVEMENTS IN ARIZONA
DOI:
https://doi.org/10.33593/iccp.v1i2.1140Keywords:
concrete pavement, faulting, PCCP, joint performance, ride qualityAbstract
Pavement faulting or step-off has been one of the major problems on Arizona's Portland Cement Concrete Pavements. Other problems have included warping and curling, texture loss, and shoulder joint failures. In 1974 work was initiated in an attempt to solve some or all of these problems by building and studying "non-conventional" PCCP sections on State Route 360, The Superstition Freeway. These projects are adjacent to a conventional section, i.e., 23 cm (9 in,) PCC, 15 cm (6 in.) CTB, and 10 cm (4 in.) aggregate base. To date, full- depth 33 and 28 cm (13 and 11 in,) PCCP on subgrade and prestressed 15 cm (6 in.) PCCP on a 10 cm (4 in.) lean concrete base have been built. A 23 cm (9 in.) PCCP on 10 cm (4 in.) of Lean Concrete Base is under construction. The main items of study are joint performance and ride quality. Full depth PCCP results in lower joint deflections in comparison to conventional PCCP. The extra slab thickness and joint surface area do not overcome the effects of joint separation from shrinkage due to curing and temperature changes. Loss of rideability is somewhat less on full depth versus conventional PCCP.