SOME NEW CONSTRUCTION METHODS FOR PRESTRESSED CONCRETE AIRPORT PAVEMENTS

Authors

  • Katsuhisa Sato
  • Tsutomu Fukute
  • Haruo Inukai

DOI:

https://doi.org/10.33593/iccp.v1i2.1152

Keywords:

prestressed, airport, PC, slab, horn-joint, PC precast slab

Abstract

Studies on the applicability of a class III prestressed concrete. (PC) slab, in which cracking at the bottom of the slab is permitted, and the development of a new type of PC precast slab with a new jointing system (horn-joint) for air­ port pavements have been carried out. From the results of theoretical analysis and a series of full scale loading tests on class III PC pavements, it has become clear that a class III PC slab can be satisfactorily used for airport pavements. This type of pavement may be a more rationalized one for heavy aircraft. In addition, the results of a series of full scale loading tests on the PC precast slab pavement connected with horn-joints have shown that this new type of pavement has a sufficient load carrying capacity and can be applied even to pavements subjected to heavy aircraft. Since an allowance for the curing time on in-situ concrete is not necessary in this type of pavement, the construction time is so fast that it may be ideal for the rapid repairs of existing pavements.

Downloads

Published

2025-01-04

How to Cite

[1]
Sato, K. et al. 2025. SOME NEW CONSTRUCTION METHODS FOR PRESTRESSED CONCRETE AIRPORT PAVEMENTS. Proceedings of the International Conference on Concrete Pavements. 1, 2 (Jan. 2025). DOI:https://doi.org/10.33593/iccp.v1i2.1152.