INVESTIGATION OF THE OPTIMUM TIME FOR CUTTING JOINTS IN CONCRETE ROADS
DOI:
https://doi.org/10.33593/iccp.v7i1.226Keywords:
optimum time, cutting joints, Sweden, trialAbstract
This paper describes an investigation of the optimum time for cutting joints in concrete pavements with a normal surface and a surface with exposed aggregate. The results from the laboratory test show differences in the earliest cutting times for a normal surface and for a surface with exposed aggregate. For a normal surface the concrete is sufficiently strong to begin cutting without causing external damage at a compressive strength around 6.5 MPa, while an exposed surface has to reach about 9 MPa. In this trial this means that the earliest cutting time is 9.25 hours for the normal surface and 10.25 hours for the exposed surface.
Downloads
Published
2001-09-09
Issue
Section
Articles
How to Cite
[1]
Löfsjögård, M. 2001. INVESTIGATION OF THE OPTIMUM TIME FOR CUTTING JOINTS IN CONCRETE ROADS. Proceedings of the International Conference on Concrete Pavements. 7, 1 (Sep. 2001). DOI:https://doi.org/10.33593/iccp.v7i1.226.