CONCRETE PAVEMENTS AT THE MUNICH AIRPORT: DESIGN, CONSTRUCTION AND PERFORMANCE
DOI:
https://doi.org/10.33593/iccp.v7i1.242Keywords:
Germany, Munich construction method, airport, slipform construction techniqueAbstract
A new airport was built at Munich between 1985 and 1992 (Fig. 1). Two 60 m wide and 4,000 m long runways, as well as all taxiways and aprons were given a two-layer, non-reinforced con- crete pavement with doweled transverse joints (i. e. jointed plain concrete pavement, JPCP), us- ing the slipform construction technique. The aircraft movement areas in concrete have stood the test of time extremely well. Some 20 million passengers having used the airport in 2000, there- fore a second terminal and a second apron are needed. The apron will be constructed also using the "Munich construction method", which has been the model for other German airport, too. The only modification concerns joint filling: Polysulfide-based compounds will replace bituminous joint fillers in the aircraft parking areas – where aircraft are refueled.