The rehabilitation of the Antwerp Ring Road in CRCP
DOI:
https://doi.org/10.33593/iccp.v8i1.603Keywords:
rehabilitation, ring road, CRCP, LCCA, MCA, terminal joint, life cycle cost analysis, multi criteria analysis, antwerp ring roadAbstract
The rehabilitation of the Ring Road of the city of Antwerp is, without doubt, the largest and most discussed road construction project undertaken in Belgium in recent years. The Antwerp Ring Road is one of the most trafficked freeways of European importance. Six radial freeways are tying into it and traffic volumes on its busiest sections are nearing 200000 vehicles per day, 25% of which are heavy trucks. The dual carriageway of the Ring is 14.2 kilometers long. The number of lanes varies from four to seven in each direction. Along with 30 kilometers of access and exit ramps on the interchanges, the project comprises a total of 100 hectares of pavement requiring renewal and full recycling. Considering the economic importance of the Ring for the Port of Antwerp, the rehabilitation works envisaged a safe, modern and efficient Ring Road, having a low maintenance pavement with a service life of at least 35 years. Based on a Life Cycle Cost Analysis and a Multi Criteria Analysis, a continuously reinforced concrete pavement has been chosen for the main part of the Ring Road. The complete pavement structure is being renewed and consists of 23 cm of CRCP, a 5 cm thick bituminous inter-layer, 25 cm cement stabilized granulated asphalt rubble and 15 cm granulated lean concrete rubble. A fine exposed aggregate surface combines a good skid resistance with a low level of rolling noise. The paper describes the presently applied common practice for the construction of CRCP in Belgium (longitudinal and transverse reinforcement steel, tie bars, anchoring abutments…) and highlights the details of execution as they have been applied for the rehabilitation works. Some particular aspects are the use of a new type of terminal joint and the design and construction of CRCP with variable width on the auxiliary lanes. By the latter method of construction, only short transverse transition joints occurred between the CRCP on the auxiliary lanes and the asphalt pavement on the ramps. The experience in designing and constructing this ambitious project will certainly contribute to a further development of the technique of CRCP in Belgium and in other countries.