Design and Construction of Concrete Pavement On Interstate 66 in Fairfax County, Virginia Applications of New Technologies
DOI:
https://doi.org/10.33593/iccp.v6i1.667Keywords:
concrete pavement, interstate, subgrade soil, drainage layer, traffic, new technologiesAbstract
The article details the implementation of innovative technologies in the design and construction of a 10.3-kilometer concrete pavement on Interstate 66 in Fairfax County, Virginia, as part of a $140 million reconstruction project. Key technologies employed include cement stabilization of subgrade soils, use of a stabilized open-graded drainage layer, recycling of the original concrete pavement, and the introduction of fast-track concrete paving techniques. The project faced challenges due to deteriorating conditions of the original pavement, constructed in the early 1960s, under increasing traffic volumes. A comprehensive study involving traffic analysis, soil surveys, and structural assessments informed the decision to replace the existing pavement entirely with a new structure designed for improved drainage and durability. Construction strategies prioritized minimizing traffic disruption and maximizing the use of recycled materials. The successful completion of the project on schedule, despite additional work and unforeseen conditions, illustrates the viability of rapid concrete pavement construction using advanced technologies and materials. (Abstract generated by AI tool ChatGPT 4)