FAST TRACK PAVING: MEETING THE NEED FOR EARLY USE OF PAVEMENT
DOI:
https://doi.org/10.33593/iccp.v4i1.915Keywords:
fast track, early use, beam flexural strength, mix designAbstract
Fast Track is the name that has been given to a technique that permits Portland cement concrete pavements to be opened to traffic in a day or less. The method has been developed and used in the state of Iowa to minimize the time that a roadway is denied to traffic because of the placement of new pavement. Through the proper selection of cement type, mix design, and curing conditions, it has been possible to achieve beam flexural strengths in excess of 400 psi in 12 hours. The Iowa Department of Transportation (DOT) considers 350 psi the minimum flexural strength necessary to open a pavement to traffic. The Fast Track paving technique was first used on several demonstration projects in 1986. In 1987, the technique was used for nine additional projects where there was a need to open the roadway to traffic as soon as possible or to facilitate subsequent paving operations. This paper discusses the development effort, mix design, construction techniques, and pavement performance for several projects. Fast Track paving offers an attractive solution to private owners and govern ments who cannot allow a roadway to be closed to traffic for a significant period of time.